Event Title

Lost Circulation Problems and Solutions

Faculty Mentor

S. Saleh

Location

Orchestra Room, Angelle Hall

Start Date

12-4-2014 10:45 AM

End Date

12-4-2014 11:45 AM

Description

The basic outline of the project focuses on problems seen in the field due to lost circulation of drilling fluids in the wellbore. This is one of the biggest contributors to non-productive time while drilling a well. In the oil industry, any time lost is money that is lost. We use laboratory experiments such as permeability plugging testing to simulate fluid loss and use certain lost circulation materials to correct, reduce or eliminate this loss based on the particle sizes found in the mud and the LCMs.

This document is currently not available here.

Share

COinS
 
Apr 12th, 10:45 AM Apr 12th, 11:45 AM

Lost Circulation Problems and Solutions

Orchestra Room, Angelle Hall

The basic outline of the project focuses on problems seen in the field due to lost circulation of drilling fluids in the wellbore. This is one of the biggest contributors to non-productive time while drilling a well. In the oil industry, any time lost is money that is lost. We use laboratory experiments such as permeability plugging testing to simulate fluid loss and use certain lost circulation materials to correct, reduce or eliminate this loss based on the particle sizes found in the mud and the LCMs.